Sportscape - Sports Field Design

Toll Free 1-888-784-5586
(US and Canada)

(330)726-9452
info@sportscapeonline.com

P.O. Box 3724
Boardman, OH 44513

   

California Lutheran University
Thousand Oaks, CA

Setting the Subgrade
  Fig. 01 Fig. 02 Fig. 03    
             
Setting the Poles
           
Irrigation
Fig. 04 Fig. 05 Fig. 06    
             
Backstop Cable and Netting
   
             
Building the Infield
Fig. 07 Fig. 08 Fig. 09 Fig. 10 Fig. 11
             
  Fig. 12 Fig. 13 Fig. 14 Fig. 15 Fig. 16  
             
 
Fence and Windscreen
       
           
           
Building the Warning Track
Fig. 17 Fig. 18 Fig. 19 Fig. 20 Fig. 21 Fig. 22
           
Sodding
 
             
Building the Bullpens
Fig. 23 Fig. 24 Fig. 25    
             
Overseeding
(One month after sodding)
   
             
Outfield Topsoil and Final Grading
Fig. 26    
             
Fertilizing
(One month after overseeding)
       
             
Building the Batting Tunnel
 
             
Fertilizing, Weed Control, and Field Maintenance
(Two months after overseeding)
   
             
Building the Backstop Wall
           
Job Complete
(Turned over to maintenance staff)